HOME > Application Example / Civil

Application Example / Civil

導入事例/建設土木

Application Example

Tunnel, Underground-cavern, Dam, Bridge, Elevated-railway, Slope, Port, Airport

– Acoustic Emission for micro crack
– Tomography for damaged area
– Vibration monitor by accelerometer and seismometer
– Stress measurement (over-coring)
– Micro-wave Displacement measurement


Case 1

AE Monitoring of rock structure during excavation at Underground LPG Storage

With embedded AE sensors (FOD and PZT) near underground cavern, EDZ (Excavated Damaged Zone) was evaluated after excavation work by dynamite.

AE Monitoring of rock structure during excavation at Underground LPG Storage

Case 2

Measurement of rock stress of an underground cavern

With over-coring method which utilizes a molded strain gauge, stress analysis was made for underground rock.

Measurement of rock stress of an underground cavern

Case 3

AE measurement of rock destruction test

Obtain rock strength data, from sample core extracted at site.

AE measurement of rock destruction test